Timmins Project

INTRODUCTION

Timmins Project

Click image to enlarge
Click image to enlarge

PROJECT HIGHLIGHTS

Timmins North Nickel Project : NORTH BLOCK

The “North Block” consists of 236 claims located approximately 21 kilometres west of Canada Nickel Company’s (CNC’s) Crawford Project.

Only 8 holes drilled (NKV22-01 to 03, NKV23-01 to 03). Notable result: Hole NKV22-03 intersected 11.5 m of 0.15% nickel from 244 m depth.

  • This early-stage drilling confirms nickel-bearing ultramafic rocks and validates the geophysical targeting strategy. The next phase will include further drill testing and data integration to expand known mineralization.
  • Geophysical surveys have been completed, including VTEM, that have outlined a series of conductors.
Click image to enlarge
Click image to enlarge
Click image to enlarge

Timmins North Nickel Project : SOUTH BLOCK

The “South Block” consists of 50 claims contiguous to Canada Nickel’s MacDiarmid Project.

  • Potential to use Glencore’s nearby Kidd Creek Mill for smaller scale start-up.
  • Historic exploration work includes limited drilling with 0.132% Ni
  • Geophysical surveys reveal the MacDiarmid target to be approximately 1.8 kilometers long indicating a structural footprint averaging 400 meters in width and 15% larger than CNC’s original Crawford’s Main Zone discovery.
Click image to enlarge
Click image to enlarge
Click image to enlarge